Heater RFQ checklist: nine numbers, one drawing

A quotation for a custom heater is not a catalogue lookup. The supplier is designing a pressure boundary, an electrical assembly and a thermal element in one object, and every missing datum becomes either a question back to you or a wrong answer in the price. This is the list that gets a real number in one round.

  • Medium and its properties
  • Flow and both temperatures
  • Electrical supply as installed
  • The envelope, in a sketch

SizingPublished 2026-10-08中文版 ↗

01The process block — five numbers

Medium

Water, oil, air, gas, or a named fluid. If it is a mixture, a solvent, or contains chloride, say so: it changes the sheath material and the watt density, and therefore the price of the element.

Flow or mass

For a flow-through heater: Nm³/h, m³/h, kg/h or L/min — state which. For a tank heater: the volume and how often it is emptied and refilled.

Inlet and outlet temperature

Both, not the rise. Ambient matters too: an outdoor installation in a cold climate has a colder inlet than the same machine indoors.

Pressure

Design pressure and working pressure. Above atmospheric, the heater becomes a pressure envelope and the shell, welds and test regime all follow from that number.

Duty pattern

Continuous, batch, seasonal, or standby. A bank sized for continuous holding and a bank sized for a 40-minute recovery are different machines at different prices.

If you can only send three of the five, send medium, flow and both temperatures. Those three let a supplier estimate; the other two let them commit.

02The electrical block — two numbers

Supply

Voltage, phase and frequency as they exist at the terminal — 400 V 3-phase 50 Hz, 480 V 3-phase 60 Hz, 240 V single-phase. A heater built for 50 Hz on a 60 Hz plant is a control-voltage and fan problem, not a minor detail.

Available capacity

The breaker or transformer capacity you can dedicate to this heater. This is the number that decides whether the bank can be built in the steps your control needs, and whether a soft-start or power controller is realistic.

Control expectation

On/off, steps, or modulating. Say what the process tolerance is in degrees; the supplier will choose the switching method from that, not from a preference.

Cable entry

Where the supply comes in, what size gland, and whether the terminal compartment must be Ex-rated or weatherproof. This is where installation cost hides.

Send the nameplate of the existing supply if this is a replacement. A photograph of the panel and a photograph of the old heater solve more problems than a specification paragraph.

03The mechanical block — one sketch

Envelope

A dimensioned sketch or a photo with a tape measure: available length, diameter, flange face location, and the direction the outlet must point.

Connection

Flange standard and size, thread, tri-clamp, or weld-end. State the mating face on your side, not just what you want the heater to have.

Mounting

Horizontal, vertical, or into a tank through an existing nozzle. Vertical gas heaters drain differently and horizontal ones need the element support thought through.

Access for service

Can the core be pulled without dismantling the pipework? If not, say so now, because it changes the flange and terminal choices.

A sketch is worth the whole electrical block in saved time. Every custom heater is drawn before it is built, and the drawing is where the price is decided.

04The commercial block — what to state out loud

Quantity and spares. Elements are consumables; ordering two spare elements with the unit is almost always cheaper than an unplanned shutdown, and the thread and length must match exactly.

Delivery window and the shipping mode. A 2.4 m, 600 kg heater is not a parcel: state whether you need road, sea or air, and whether the site can receive an oversize pallet or a lift-in crate.

Packing requirements for your country. Timber packaging needs ISPM-15 treatment for international shipment, and the mark must be on the crate — ask for it explicitly if your customs authority checks.

Documentation you will be asked for: certificate of conformity to the drawing, hydrostatic or pressure test record, electrical test record (hipot and insulation resistance), material declarations for wetted parts, and a wiring diagram in the language your maintenance team reads.

Any code or classification your project requires. State it as a requirement with the standard and the zone or division; a supplier who is not told will design to their own default, and unwinding that after manufacture is expensive.

The last line of the list is the honest one: say what you do not know. "Gas is compressed air at 6 bar, temperature unknown, we want 60°C" is a workable inquiry. A guessed number is not.

Send this duty over and we will run it through the same method

Medium, flow, temperatures, pressure. With those four, duty and architecture are a same-day answer.

Submit your duty →

FAQ

Common questions

01Can I just send the old heater and ask for a copy?+

Often yes, and it is a good inquiry if the old unit actually worked. Send photos of the nameplate, the terminal head and the flange face, plus the reason it is being replaced — a copy of a failed design is still a failed design.

02What if I do not know the flow or the medium properties?+

Send what the process does instead: what is being heated, how much per hour, from what temperature to what temperature, and how long it is allowed to take. A supplier can work backwards from a duty statement; they cannot work backwards from a kW.

03Should I ask for a watt density figure in the quotation?+

Yes, and ask for it per element, with the heated length stated. It is the single number that tells you whether the design is conservative or merely cheap.

INQUIRY PREP

Come prepared, decide faster on Tubular Elements

Have these parameters ready — they feed directly into model selection, power sizing and mechanical design review.
Send your spec ↗
K13Electric heaters for paint curing and powder coating ovensHow to size an electric heater for a paint curing or powder coating oven: the four real loads, a worked tunnel example, element layout in recirculating air, and the three commissioning failures that get blamed on the heater.K14Electric heating for lithium-ion electrode coating linesSizing electric heaters for lithium-ion electrode coating dryers: sensible plus latent load per zone, dew-point-driven airflow, worked zone arithmetic, watt density in dry air and nitrogen, and the interlocks that matter.K15Electric thermal oil heaters for presses, platens and rollsHow to specify an electric thermal oil heater for presses, platens and rolls: duty and flow arithmetic, design ΔT across the plate, the 2.5 W/cm² heat-flux and 1.5-2 m/s velocity limits, circuit layout and the start-stop sequence.K16Electric heating for bitumen and asphalt storage tanksElectric heating for bitumen and asphalt storage tanks: why viscous stagnant product forces low watt density, standing-loss and melt-through sizing, element and sensing detail, and the operating habits that decide element life.K17Electric heaters for nitrogen and other inert gasesSizing electric heaters for nitrogen, argon and other inert gases: mass flow and cp arithmetic, a worked superheat example, why small kW still means high sheath temperature, velocity and pressure effects, and the interlocks.K18Immersion heaters for hydraulic oil reservoirsHow to choose an immersion heater for a hydraulic oil reservoir: viscosity targets, warm-up and standing-loss sizing, the 1-1.5 W/cm² static-oil limit, placement and control, and the four failures that destroy elements.K19Electric heating for CIP wash water and clean tanksElectric heating for CIP and wash-water tanks: kW from volume and recovery time, sheath material against caustic, acid and chlorine, watt density in tank duty, and surviving the drained phase between cycles.K20Electric reheat for cleanroom and pharmaceutical AHUsElectric reheat in cleanroom and pharmaceutical air handling: duty from airflow and ΔT, hygienic element construction, face velocity limits, SCR versus stepped control, and the interlocks and documentation a validated plant expects.K21Electric or gas heating for an industrial drying line?A practical comparison of electric and gas heating for industrial drying lines: installed cost, permits, turndown, response, combustion moisture, demand charges and standby — with the arithmetic to run on your own tariff.K7What watt density should an electric heater tube use?How to calculate watt density, the working ranges for water, oil, still air and forced air, and the four mistakes that burn tubes: total power only, heated length, scaling and supply voltage.K8How to support a pipeline heater and allow for expansion?Bracket layout for pipeline heaters, expansion growth by material, why both-ends-fixed joints leak, and the cold-plus-hot commissioning checks.K9What protection settings does an electric thermal oil heater need?The four guards on electric thermal oil heaters — outlet high limit, low level, loss of circulation and sheath over-temperature — their action order, why film temperature governs, and typical missettings.